5 stars RADISSON BLU Hotel – CAM RANH

Total capacity: 14 700 kWh

Payback: 3 years

Position: Ice tank in basement of technical area

Finish installation: 9/2018

Picture 1: Concrete ice tank in basement of technical area under construction

Picture 2: Liner

Picture 3: Heat exchanger inside the tank

  

Picture 3: Manifold and Heat exchanger inside the tank