Parameter Detail Partner Big C Viet Tri (Supermarket & Shopping Center) Core products Thermal Energy Storage (TES) Cold Storage Capacity 8,900 kWh Payback Period (ROI) 3.5 years Installation location Concrete tank placed outside the building Delivery time Augu
Parameter Detail Partner Big C Nha Trang (Supermarket & Shopping Center) Core products Thermal Energy Storage (TES) Cold Storage Capacity 13,400 kWh Payback Period (ROI) 3.5 years Installation location Exposed in the basement Delivery time October 2014 Challen
Parameter Detail Partner Big C Quy Nhon (Supermarket & Shopping Center) Core products Thermal Energy Storage (TES) Cold Storage Capacity 13,500 kWh Payback Period (ROI) 3.5 years Installation location Underground in the basement Delivery time March 2014 Energy
Parameter Detail Partner Big C Ha Long (Shopping Center) Core products Thermal Energy Storage (TES) Cold Storage Capacity 13,000 kWh Payback Period (ROI) 3.5 years Installation location In the basement Delivery time May 2014 Energy Challenges in the Commercial

ESS VIETNAM will contact you within 10 minutes
Working hours (except holidays)
Monday - Saturday: 8:00 AM - 7:00 PM
Sunday: 8:00 AM - 5:30 PM
Contact hotline: 024.6293.7615 for free consultation